1. ENVIRONMENTAL LABORATORY
FACILITY
Company has a well-established Environmental
Laboratory in 2000 sq ft area, having following
facilities:
Meteorological Data Collection through
Automatic Weather Station.
Ambient Air Monitoring Facility through
Respirable Dust Sampler and High Volume
Samplers.
Stack gases/source emission analysis
Water And Waste Water Quality Monitoring And
Testing Facility
Soil Sampling And Testing Facility
Noise Level Monitoring
Ecological and Socio Economic Studies.
Heavy Metal Analysis
Microbiological Analysis
Toxicological Analysis
2. Environmental studies
Environment is defined as surrounding of human
being which comprises of air, water , land,
forest, lakes, river etc. Following studies are
being conducted by us:
Ambient Air Quality Study
Water Quality & Quantity Study
River Water System Study
Air Pollution Study
Noise Pollution Study
Bio Diversity Survey
Performance Study of Common Effluent Treatment
System
Inventorization Survey of Wastes
Socio Economy Survey
Landuse Study
3. ENVIRONMENTAL IMPACT ASSESSMENT
The objective of Environment Studies is to
fulfill the requirement of the Gazette
Notification of Ministry of Environment &
Forests (MOEF) dated 14th September 2006.
We are conversant with the existing legal and
procedural requirements of obtaining
environmental clearance for proposed project. We
guide the proponent through initial screening of
the project and establish whether EIA studies
are required to be conducted and if so finalise
the scope of such study.
We are also fully equipped with required
instruments and infrastructure for conducting
EIA studies. We are responsible for supplying
all the environment-related information required
by the SPCB and SEIAA through the proponent. We
justify the findings in the EIA and EMP during
the meeting with the expert groups at SEIAA. EIA
is mandatory to be prepared for assessing the
impact of the particular industries/development
on a particular area. .
We prepare form I , IA & EIA Report with good
proficiency & sincerity. We have prepared EIA
Repots for 184 projects comprises of
construction, CRZ, SEZ, industrial & mining
projects.
4. Environment Management Plan
After ascertaining the impact of activity on
a particular area, ,
Environmental Management Plan needs to be
prepared which consist of following:
Resource Management
Solid waste management
Rehabilitation & Resettlement Plan, if
villages are to be displaced.
Air Pollution Control measures
Water Pollution Control & Water Balance
Occupational safety and health measures
Noise Pollution Control measures
Traffic Management
Rain Water Harvesting details
Electronic waste management plan
Green & Horticulture Management
Hazardous waste management plan
5. Risk Assessment and Management Plan
Risk assessment forms an integral part of EIA
study. Risk assessment study deals with
identifying and evaluating the magnitude of
impending risks to which the neighboring
population is exposed , due to occurrence of
accidents involved in the project .
6. Disaster Management PlaN:
Disaster Management Planning is of foremost
importance in a report as it explains the means
and measures proposed to be taken at the time of
any eventuality in the complex / unit / project.
Disaster Management Plan explains both manmade
disasters and Natural Disasters.
The means & measures undertaken to prevent and
if the eventuality happens then proposed methods
to tackle the same are given in the report.
Disaster Management Plan includes:
Risk assessment & vulnerability analysis
Flood prevention, preparedness and mitigation
Fire prevention & control
Cyclonic disaster management
Earth quake
Chemical disaster
Disaster risk management and capacity
development
Preparedness for mass casualty management
Medical preparedness for chemical, biological,
radiological and nuclear ( CBRN ) management
Security plan
7. Electronic & Hazardous Waste Management
Under Hazardous Wastes (Management and Handling)
Rules, 1989 & Hazardous Wastes (Management and
Handling) Amendment Rules, 2003.
We specialize in management & designing of
Electronic & Hazardous categorized in the act.
SERVICES FOR E-WASTE AND HAZARDOUS WASTE
INCLUDE:
Identification of sources for E- Waste and
Hazardous Waste
Characterization of E-Waste and Hazardous
Waste
E-Waste and Hazardous Waste treatment and
disposal plan
Designing, Detailing of E-Waste and Hazardous
Waste recycling facility
Approval for Electronic Waste Management and
Hazardous Waste Management from Central /State
Pollution Control Boards
Approval for Electronic Waste Management and
Hazardous Waste Management from Ministry of
Environment & Forests, Govt. of India.
8. Biomedical Waste Management
Under Bio-medical Waste Rules 1998, It is the
duty of every generator of bio-medical waste (to
take all steps to ensure that such waste is
handled without any adverse effect to human
health and the environment.
SERVICES FOR BIO MEDICAL WASTE include:
Identification of sources for BIO - Medical
Waste
Characterization of Bio - Medical Waste
Bio Medical Waste treatment and disposal plan
Designing, Detailing of Bio - Medical Waste
recycling facility in form of pre-feasibility.
Approval for Bio - Medical Waste Management
from State Pollution Control Boards
Approval for Bio - Medical Waste Management
from Ministry of
Environment & Forests, Govt. of India.
Designing of Air Pollution Control Systems,
ETP for Zero discharge, Sewage Treatment Plants,
Noise Pollution Control Systems
Training of manpower for Bio - Medical waste
recycling process
Manual for operation and maintenance of
facility
Establishment of Environment Management System
and Registration of facility under ISO 14001
Supervision and Trial Run of facility
9. Designing & installation of Pollution
Control System For:
Air Emissions Control Systems
Water Pollution Control Systems
Rain water harvesting
Noise Pollution Control Systems
10. Operation & Maintenance of Effluent
Treatment Plant [E.T.P.] & Sewage Treatment
Plant [S.T.P.]
11. Environmental Monitoring including
Sampling & Testing of Environmental Parameters.
12. Environnent Audit:
Vide circular No.J-11013/41/2006-IA.II (I) dated
24/3/09. & J-11013/41/2006-IA.II (I) dated
30/6/09. MOEF has informed that The
Environmental Clearance Statement for each
financial year ending 31st March in Form-V is to
be prepared and submitted by the project
proponent to the concerned State Pollution
Control Board.
Environmental auditing carried out by us is a
systematic, documented, periodic and objective
process in assessing an organization's
activities and services in relation to following
objectives:
Verification of legislative and regulatory
compliance
Assessment of internal policy and procedural
conformance
Establishment of current practice status
Identification of improvement opportunities
13. Energy Audit:
As per the Energy Conservation Act, 2001, Energy
Audit is defined as the verification,
monitoring and analysis of use of energy
including submission of technical report
containing recommendations for improving energy
efficiency with cost benefit analysis and an
action plan to reduce energy consumption.
Industrial energy audit conducted by us serves
to be an effective tool in defining and pursuing
comprehensive energy management programme.
14. ISO-9001-2008
ISO developed ISO-9000 series of Standards
basically meant for Quality Management System.
ISO-9001:2008 Quality Management System
certification enables an organization to
demonstrate its commitment to the quality as
well as continuously improving the image of the
organization and integrating the realities of a
changing world.
Proper Implementation of ISO-9001:2008 brings
many benefits to an organization including
improved customer satisfaction, increased market
share and greater competitive strength.
15. ISO-14001-2004
ISO-14001 is Environmental Management Systems-
Requirements with guidance for use is an
International Standard adopted by ISO. This
Standard provides for the framework for the
Management System for an organization to meet
its environmental obligations reliably and
consistently. |